Flatiron Aecon JV Peace River Bridge

Project Overview

NexGen transported 85 bridge girders from a rail siding south of Peace river to the new bridge in town Highlights below:

what we did

  • Bridge Girders being hauled are 126’ long, 177 000 LBS and 6M in height
  • Full crew and equipment coverage 7 days a week
  • Looking after shunting operations and offload of rail cars- together with the Myshak Group providing one stop shop for the client
  • All work completed incident free

details

Equipment used:

  • 12-Line K25 Trailer